docs: require green CI after every push (ci-wait)

Claude-Session: https://claude.ai/code/session_0174biCAUrv7B2cBcV6vgUTK
This commit is contained in:
victormanuel.caverogracia 2026-09-08 00:39:10 +02:00
parent 134ad5431e
commit 41aa9bc013

View file

@ -432,3 +432,8 @@ container before stopping the old one (rolling update) and both share
Before pushing, still batch small commits (tests, docs) with the next real Before pushing, still batch small commits (tests, docs) with the next real
change: every deploy is a ~5 min build plus a handover. change: every deploy is a ~5 min build plus a handover.
## CI: a green pipeline closes the task, not the push
- After every `git push`, wait for the commit's workflow and confirm it is green: `ci-wait` (Victor's Mac) or `gh run watch $(gh run list -c $(git rev-parse HEAD) -L1 --json databaseId -q ".[0].databaseId") --exit-status`.
- If it is red: fix, push, check again. Never report the task as done with a red CI.
- Before pushing, run locally what the CI runs (lint + tests of this repo).