docs: require green CI after every push (ci-wait)
Claude-Session: https://claude.ai/code/session_0174biCAUrv7B2cBcV6vgUTK
This commit is contained in:
parent
134ad5431e
commit
41aa9bc013
1 changed files with 5 additions and 0 deletions
|
|
@ -432,3 +432,8 @@ container before stopping the old one (rolling update) and both share
|
||||||
|
|
||||||
Before pushing, still batch small commits (tests, docs) with the next real
|
Before pushing, still batch small commits (tests, docs) with the next real
|
||||||
change: every deploy is a ~5 min build plus a handover.
|
change: every deploy is a ~5 min build plus a handover.
|
||||||
|
|
||||||
|
## CI: a green pipeline closes the task, not the push
|
||||||
|
- After every `git push`, wait for the commit's workflow and confirm it is green: `ci-wait` (Victor's Mac) or `gh run watch $(gh run list -c $(git rev-parse HEAD) -L1 --json databaseId -q ".[0].databaseId") --exit-status`.
|
||||||
|
- If it is red: fix, push, check again. Never report the task as done with a red CI.
|
||||||
|
- Before pushing, run locally what the CI runs (lint + tests of this repo).
|
||||||
|
|
|
||||||
Loading…
Reference in a new issue